Power Plant Construction, Compliance Monitoring, and Enforcement Program — CA Energy Commission funding opportunity
CA Energy Commission · State agency

Power Plant Construction, Compliance Monitoring, and Enforcement Program

Compliance and Monitoring The California Energy Commission (CEC) is the chief building official for projects that it licenses. Power plants of 50 megawatts or larger are decommissioned in accordance with their conditions...

65
match
Deadline Rolling Location California Type grant Level State Open
✦ AI Summary
  • Who can apply: State-level applicants (see eligibility for details).
  • Deadline: Rolling — applications accepted any time.
  • Issued by: CA Energy Commission.
How was this generated?

The “key facts” mode pulls structured fields directly from the official source posting (amount, deadline, eligibility tags). The AI mode adds a short plain-English narrative on top, generated from the same source. Always verify with the agency before applying.

AI-generated. Always verify with the official source.

Who can apply — at a glance

  • Eligible applicants: see the Eligibility tab for the criteria from the official announcement.
  • Where: California.
  • Award: amount not specified by the source.
  • Matching funds: not required.
  • Deadline type: Rolling.

Compiled from the official listing's structured fields — always verify with the funder before applying.

About the funder

CA Energy Commission is a state-level funder.

See all 32 open programs from this agency →

Deadline
Rolling

About this opportunity

Compliance and Monitoring The California Energy Commission (CEC) is the chief building official for projects that it licenses. Power plants of 50 megawatts or larger are decommissioned in accordance with their conditions of certification and all standards (also known as LORS) per Public Resources Code (PRC) Sections 25532 to 25534.2 and Title 20, Division 2, Section 1769 of the California Code of Regulations.  Additionally, under PRC Section 25532, the CEC is required to ensure that any facility certified under Division 15 of the PRC is operating in compliance with conditions adopted or established by the CEC or specified in the written decision on the application. California Code of Regulations, Title 20, section 1770 requires the CEC to “provide adequate monitoring of all conditions and measures set forth in the final decision required to mitigate potential impacts and to assure that the facility is operated in compliance with all applicable laws.” Finally, California Code of Regulations, Title 20, Section 1769 states in part “After the final decision is effective… the project owner shall petition the commission for approval of any change it proposes to the project performance requirements.” In 2022, Assembly Bill 205 was enacted.  Under this bill, the Opt-In Certification Process was established, allowing certain clean and renewable energy development projects to choose a consolidated state permitting option. The CEC is the lead agency for environmental review and permitting, and any approved project follows the same post-certification monitoring requirements. Enforcement The Warren-Alquist Act states that the CEC administratively imposes a civil penalty for significant failure to comply with the terms or conditions of approval as specified by the commission in its written decision. Civil penalties are in accordance with PRC Sections 25534.1, and § 25534 (a)(2)); and PRC Section 25534(b) details that for each violation there is a daily fine attached for each day in which the violation has not been addressed. Upcoming Events No events are available at this time.

Funding agency

CA Energy Commission
State agency

Tags

Want help applying?

Our specialists will check your eligibility, prepare the application, and walk you through every step — for free. Create a free account →

Who can apply

Eligibility details aren't on file yet — check the agency source link in the Documents tab for the latest rules.

Geographic eligibility

  • California

How to apply

We don't have application instructions on file yet — head straight to the official source.

Apply on agency site
Tip from our team:

Read the agency's eligibility checklist before you start — it's almost always shorter than the full NOFO and will tell you in 90 seconds whether to keep going.

Need help getting in touch with the right agency contact?

Create a free account and our specialists will guide you through the application end-to-end.

Source documents

View on agency site
Canonical NOFO, application packet, and forms
No supplemental documents yet.

Direct downloads (NOFO PDFs, application forms, FAQs) will appear here once our team attaches them. For now, the agency site has the canonical packet.

Citation details

Source systemca-cec
Source IDprograms-and-topics-programs-power-plant-construction-compliance-monitoring-and-enforcement-program

Frequently asked questions

No FAQs yet.

Have a question about this fund? Sign in to open a ticket about this fund.