Small Power Plant Exemption Program — CA Energy Commission funding opportunity
CA Energy Commission · State agency

Small Power Plant Exemption Program

The California Energy Commission (CEC) has exclusive jurisdiction to review, and approve or deny, applications to construct and operate thermal and geothermal power plants and their related facilities, such as transmissi...

66
match
Deadline Rolling Location California Type grant Level State Open
✦ AI Summary
  • Who can apply: State-level applicants (see eligibility for details).
  • Deadline: Rolling — applications accepted any time.
  • Issued by: CA Energy Commission.
How was this generated?

The “key facts” mode pulls structured fields directly from the official source posting (amount, deadline, eligibility tags). The AI mode adds a short plain-English narrative on top, generated from the same source. Always verify with the agency before applying.

AI-generated. Always verify with the official source.

Who can apply — at a glance

  • Eligible applicants: see the Eligibility tab for the criteria from the official announcement.
  • Where: California.
  • Award: amount not specified by the source.
  • Matching funds: not required.
  • Deadline type: Rolling.

Compiled from the official listing's structured fields — always verify with the funder before applying.

About the funder

CA Energy Commission is a state-level funder.

See all 35 open programs from this agency →

Deadline
Rolling

About this opportunity

The California Energy Commission (CEC) has exclusive jurisdiction to review, and approve or deny, applications to construct and operate thermal and geothermal power plants and their related facilities, such as transmission to and from the power plant, that generate 50 MW or more, as provided under the Warren-Alquist Act. Pursuant to Public Resources Code section 25541, power plant projects that can generate more than 50 MW but less than 100 MW, developers may apply for a Small Power Plant Exemption (SPPE). As the lead agency under the California Environmental Quality Act (CEQA) and under the California Code Regulations Title 20, if the CEC determines that the proposed project would not create a substantial adverse impact on the environment or energy resources, it may grant this exemption. Upon granting SPPE, the local land use agency, typically the county or city government with jurisdiction over the project site, assumes permitting authority for the project. If the application for the SPPE is denied, the project applicant would be required to file an Application for Certification (AFC) with the CEC. Applicants requesting a SPPE must reimburse the CEC’s actual cost to prepare and process a negative declaration, mitigated negative declaration, or environmental impact report pursuant to the California Environmental Quality Act.  A deposit is required at the time of filing. If costs exceed the deposit, the applicant will be billed for the difference. A refund will be provided if the costs are less than the deposit. There is no annual compliance fee since the CEC is not licensing the project if the small power plant exemption is granted. Expand All Collapse All Preparing CEQA Documents As the lead agency under the California Environmental Quality Act (CEQA), the CEC reviews an SPPE application and prepares the appropriate environmental document; for example, an environmental impact report or a mitigated negative declaration. The CEC can approve an exemption if it finds that the proposed facility would not create a substantial adverse impact on the environment or energy resources. If the CEC approves the exemption, the project developer is responsible for securing federal permits to construct and operate the plant. Local and state agencies will consider the environmental document prepared by the CEC for any discretionary decisions subject to CEQA. Power Plant Licensing Associated Infrastructure On  May 26, 2026 - PDF the CEC adopted regulations to amend the definition of related facility and add a definition of an appurtenant facility. These updates to Title 20, California Code of Regulations, section 1201, clarify: Generation may be jurisdictional Electrical equipment connecting generation may be jurisdictional Data center buildings are not jurisdictional, even if they are served by a CEC-jurisdictional energy facility Data Centers The CEC does not permit data centers but does have jurisdiction over certain energy infrastructure associated with them under its exclusive permitting authority to certify all thermal generating facilities 50 megawatts (MW) and larger in California. While most data centers rely on the electric grid as their primary source of power, they typically require on-site electricity generation for backup power, most commonly diesel-powered generators. These backup generators only run during maintenance, but still require permits to build and operate. Data Centers Application Fees The CEC is authorized to apply application fees pursuant to Public Resources Code, Division 15, Chapter 6, sections 25500-25543; California Code of Regulations, Title 20, Division 2, Chapter 5, and California Code of Regulations, title 20, section 2300.1.  Learn more about the application fees and deposit on the CEC Licensing and Compliance webpage. Licensing and Compliance Upcoming Events No events are available at this time.

Funding agency

CA Energy Commission
State agency

Tags

Want help applying?

Our specialists will check your eligibility, prepare the application, and walk you through every step — for free. Create a free account →

Who can apply

Eligibility details aren't on file yet — check the agency source link in the Documents tab for the latest rules.

Geographic eligibility

  • California

How to apply

We don't have application instructions on file yet — head straight to the official source.

Apply on agency site
Tip from our team:

Read the agency's eligibility checklist before you start — it's almost always shorter than the full NOFO and will tell you in 90 seconds whether to keep going.

Need help getting in touch with the right agency contact?

Create a free account and our specialists will guide you through the application end-to-end.

Source documents

View on agency site
Canonical NOFO, application packet, and forms
No supplemental documents yet.

Direct downloads (NOFO PDFs, application forms, FAQs) will appear here once our team attaches them. For now, the agency site has the canonical packet.

Citation details

Source systemca-cec
Source IDprograms-and-topics-programs-small-power-plant-exemption-program

Frequently asked questions

No FAQs yet.

Have a question about this fund? Sign in to open a ticket about this fund.